desulfuration system wear & co > slurry pipe absorption tower wearing compound epoxy coating

slurry pipe absorption tower wearing compound epoxy coating

slurry pipe absorption tower wearing compound epoxy coating
BD7053 desulfurization rubber ceramic lining pipeline wearing compound coating,
desulfuration slurry absorption tower pipe epoxy repair anti abrasion
corrosion resistant coatings

 
product description:
The BD7053 desulfuration system absorption tower and slurry pipeline repairing anti corrosion wearing abrasion resistant coating is
the high performance high temperature resistant, wear & corrosion resistant polymeric ceramic material compounded by high performance
abrasion wear resistant,corrosion resistant materials and modified toughening heat resistant resin.It’s the abrasion resistant coating of
special using in desulfurization absorption tower and slurry circulation pipeline.
 
product features of BD7053 desulfuration rubber liner pipe repair wearing compound
epoxy coatings:

1.With excellent wearing abrasion resistant performance,corrosion resistant performance                            
2.With very high bonding strength to metal,resin type substrates
3.Don't drip and slip,the construction is convenient       
4.suitable for the protection of high temperature erosive wear,corrosion working condition
5.hot water resistant,steam resistant,acid resistant,alkali resistant               
6.with good toughness,don’t crack
 
Product index of BD7053 desulfuration slurry pipe,absorption tower anti corrosion
wear resistant coating:

product name physics status operation time limit
(25¡æ)
curing time
(25¡æ)
range of application
BD7053 desulfuration absorption tower and slurry pipeline special wearing resistant compound epoxy coating paste 40min 24h Special used in the preparation and repairing of wear resistant coatings of desulfurization absorption tower and slurry circulation pipeline.
 
color density
(g/cm3)
compressive strength
(kg/cm2)
GB1041-2008
tensile strength
(kg/cm2)
GB6329-1999
shear strength
(kg/cm2)
GB7124-2008
bending strength
(kg/cm2)
GB1042-2008
hardness after curing
£¨Shore D£©
ASTM-D-2556
working temperature
£¨¡æ£©
gray 2.22 1117 383 106 561 89 -60¡«150
 
How to use:
1.Surface treatment: 
Do coarsening treatment on the pending-repair area, grinding with angle grinder or sand blasting and so on,the surface after
coarsening treatment should be cleaned,the surface after this treatment should be the one coarsening,dry and fresh substrates,
should be no greasy dirt and dust.
 
2.Preparation of BD7053 desulfurization slurry pipe ceramic rubber lining wearing resistant
compound coating:

According to the weight ratio 4:1, make A and B two components of BD7053 absorption tower,slurry pipeline special anti corrosion
abrasion resistant coatings mix uniformly,and use it up within 40 min.Generally it’s while construction and configuration.Every time
the most configuration quantity is not more than 2Kg, too much adhesive is solidified too fast,hasn’t been used up until partial
adhesive has solidified and can’t be used. According to the actual temperature,configuration can be appropriately a little more in winter,
proper less in summer.If the temperature is too low,you can properly heat up the A component to reduce viscosity for easy to configure.
 
3.Coating: 
The suitable coating thickness of BD7053 absorption tower,slurry pipeline special wear resistant coating is 2~8mm.
Make the mixed-up material spread coating on the pending-repair area layer by layer, the adhesive layers should be compacted,
make it infiltrate fully with the substrates.Repair the surface to be smooth after the coating is coated in the suitable size.
This material can’t do machining,so you should pay attention to controlling the coating thickness to avoid appearing
interference phenomenon in the assembly
.
4.Curing: 
It can be put into using after curing for 24 hours at the temperature of 25 degree.When the temperature is below 15 degree,the coatings
can’t cure completely,should heat it up to the temperature of 80 degree and keep this temperature for 2 hours to promote the coatings fully
curing after the coating initial curing (can use the iodine tungsten lamp to do irradiation heating with 40cm distance from the coating.)
 
Packaging specification:
1.Our common packaging:Two-components,20Kg/group,packed in a plastic drum,A component: 16Kg/drum,B component: 4Kg/drum.
2.We could offer you professional customized packaging and subpackage services based on our users' requirements.

Transportation and storage:
Sealed storage in the cool and dry place.The warranty period is 12 months.Avoid placing it upside down, knocking against and 
transporting it as a non-dangerous product during transportation.
 
Special version:
1.This parameter is for laboratory conditions,due to the actual working condition is more complex,suggest the users to do the
pretest according to actual working condition.

2.When the environment temperature is below 15 degree,the curing time will prolong,should take proper heating measure.

3.When the environment temperature is more than 25 degree or the mixing quantity is too large,the curing speed will expedite,
should properly shorten the application time of coating after mixing.
 
Construction protective measures:
1.Wear the protective masks,wear the protective glasses and rubber gloves
2.Need washing hands with soap before eating,drinking or smoking.
3.The health hazard after touching: a few people will have skin allergy phenomenon,see a doctor in time and avoid touching with
this product again.should wipe it with ethyl acetate when the sizing material paste on the skin by careless,then wash it with clear water.
Should wash it with clear water immediately and see a doctor when splashing into the eyes by careless.
 
Warm Prompt:
Residual adhesive solution cured products are non-toxic harmless organic solid,but maybe it will produce poisonous gas when
burning,non-professional personnel can not do combustion disposal,should be sent to garbage power plant or garbage burning
place treatment.
 
Fire prevention measures:
Should choose dry powder to extinguish fire,can cover and flap it with dry powder,grit(the construction using abrasive) or the
non chemical fiber fabric when the sizing material catching fire.

Product packaging actual photo of BD7053 slurry pipeline absorption tower rubber
ceramic lining anti wear corrosion resistant coating:

------·Ö¸ôÏß----------------------------
wear resistant
coatings /abrasion
resistant coating
backing adhesives
/crusher filling material
wear resistant
ceramic adhesive
slurry pump
wear resistant
repair coating
magnetic separator
wear resistant
protective coating
flotation cell
wear & corrosion
resistant coating
slurry circulating
pump wear resistant
repair coating
desulfuration system
wear & corrosion
resistant coating

CEO Email: jimmy@realbond.net       www.wearcoating.com    
Tel:86-0710-3122805        Mobile: 86-13995789609        Fax:86-0710-3618337