performance features of BD401 desulfurization slurry pipe rubber lining anti corrosion
epoxy cermaic repair coatings: 1.With high bonding strength,with very high bonding strength to metal,cement,concrete etc.substrate.
2.The coating after curing has good toughness and excellent aging resistance, can soak into the hot water for a long time without cracking.
3.Excellent in acid & alkali resistance,can soak into the desulfurization slurry for a long time without penetration and swelling
4.Easy operation,without very high technical requirements for constructors
product usage of BD401 slurry absorption tower rubber liner corrosion resistant high alumina
ceramic epoxy coatings: It is the high performance wear & corrosion polymerization ceramic material compounded by various high performance wear resistant,corrosion resistant material(such as ceramic,silicon carbide,carborundum,titanium alloy) and modified toughening resin.Used in repairing various pump,valve,pipeline,heat exchanger end plate and blade of suffering from corrosion,can also be used in equipment large area corrosion resistant pre-protection.Especially suitable for the preparation of corrosion resistant coatings in the power plant desulfuration system(such as:absorption tower, slurry agitation tank,concentric reducer,slurry pipeline etc.),can also be used as the undercoat and topcoat of wear resistant coating
How to use: 1.Surface treatment:Do coarsening treatment on the pending-repair part(grinding with angle grinder or sand blasting etc.), the surface after coarsening treatment should be cleaned by cleaning agent,then dry it by airing.
2.Configuration: According to the mass ratio A:B=8:1 or volume ratio A:B=5.5:1,make A and B two components of BD401 corrosion resistant coating(desulfuration special) mix uniformly,then use it up within specified operation time limit.
3.Coating: According to criss cross method,make the mixed-up material smear onto the pending-repair part for 2 times, the thickness of adhesive layer had better be 0.2-0.5mm.The adhesive layer should be compacted,make it fully infiltrates with the substrates.For large area protection,can brush for 2~3 times according to the actual condition.
4.Curing:Cure for 24 hours at the 25‘ζ before putting into use,if the temperature is below 10‘ζ,should heat it up or prolong curing time to promote the curing.General construction in winter,you can use iodine tungsten lamp do irradiation heating with 40cm distance from the coating.
Packing specification: Two component,black semi-fluid,10Kg/group,packed in a plastic drum,A component: 8.9Kg/drum,B component: 1.1Kg/drum. We could offer professional customized packaging and sub-package services based on users' requirements.
Transportation storage: Sealed storage in the cool and dry place.The warranty period is 12 months.Avoid placing it upside down, knocking against and transporting it as a non-dangerous product during transportation.